Telecom Lifters™
P.O. Box 187
16912 Cache Lane
Brownsville, CA 95919
United States

ph: Toll Free1-800-576-7260 or 530-675-2228
fax: 530-675-9575
alt: 530-743-0200

Cellular Providers

Advantages Telecom Lifters™ Can Offer You as a Cellular Provider

 

  • First & foremost Telecom Lifters™ can provide the FASTEST and SAFEST method for under cabinet installation of additional hardware in the industry today.
  • Telecom Lifters™ can provide a GREAT SAVINGS to you.
  • Telecom Lifters™ can provide you with the SMALLEST CARBON FOOTPRINT possible for lifting a cabinet.  Equivalent to heating a cup of tea in a microwave oven.  If you are interested in reducing your carbon footprint while keeping your site footprint the same, WE HAVE YOUR SOLUTION.
  • We would like to offer our benefits on installations such as these:
  1. Isolators
  2. Plinths
  3. BBU Installations
  4. 3018 Combo Units
  5. UMTS
  6. Roof Leak Repairs
  7. Or any reason to lift an existing cabinet that will remain in use on that particular site. 
  8. In some cases it may be possible to remain online while the lift occurs, only if deemed plausible by you the provider and Telecom Lifters™.

Do your crane accessibility issues include any of the following?

  • High tension wires nearby or overhead. (DANGER)
  • Cabinets placed inside a lattice tower.
  • Cabinets placed inside a shelter.
  • Cabinets on a rooftop/ skyscraper
  • Weather problems: fog, high winds, poor visibility
  • Urban access: inner city, crane parking, narrow streets, and/or traffic control.
  • Remote location: snow, mud, over weight on bridge, difficult terrain.

For remote access we can go by snow machine or ATV as necessary.

Let Telecom Lifters™ take the headache out of your workload.

Contact us today!

 

 

 

 

 

Telecom Lifters™ can handle your RBS with greater precision than any other form of lifting that has ever been used before.  We take great pride in the forward thinking we have incorporated in our invention and believe we have addressed a vast array of topics with the TL-1800, from safety to logistics of permits to site footprints and many more.

 

 

Modifying mobile telephone cell sites doesn’t have to utilize wasteful methods!


 

The Federal Environmental Protection Agency is looking at ways that the EPA can encourage and reward corporate America to reduce carbon emissions in all operations. The Kyoto Protocol looks to reduce USA carbon emissions by 7%.  Just recently, Lisa Jackson (administrator for the EPA) initiated a federal effort to reduce corporate green house gases.  Here in California, a crane accounts for 10,744 times more carbon emissions than does the Telecom Lifters’™ method for each rooftop cell site modification!  In addition to the incredibly lower carbon emissions, the fees charged by Telecom Lifters™ always are lower than those charged by the crane companies. Any contractor advertising such operational advantages to the providers will excite the providers. Public relations managers will be able to extol their protection of the environment! CFOs will love the reductions in operational expenses that Telecom Lifters™ brings. Safety Managers will appreciate the innate safety and stability of the equipment and procedures.  The use of Telecom Lifters™ instead of a crane for any rooftop project always will cost the contractor less, enabling him to bid and fulfill a lower-cost contract. With Telecom Lifters™ on the rooftop instead of a crane in the street, the community, citizens, and businesses will greatly appreciate the fact that there will be no disruption of local business, no blocked traffic, and especially there will be no imminent danger from having a huge crane, and its deadly risk, teetering over them!

 

Telecom Lifters™ can be proud of its efficient, safe, and well-designed system; it is changing the way contractors and providers conduct business in the field.  No longer is it "business as usual."

 

Assumptions and references:

1. A crane with engine running for 2-hours at jobsite

2. Crane burns about six gallons of diesel per hour = 12 gallons of diesel per project

3. Telecom Lifters™ system runs on 115VAC, and draws 4-amps = 0.46kw

4. Telecom Lifters™ takes about 2-minutes to lift an RBS, and 2-minutes to lower it, but call total run-time = 5-minutes per project

5. The emission coefficient relating to the pounds of CO2 emitted per unit volume or mass for diesel consumed can be found at   http://www.eia.doe.gov/oiaf/1605/coefficients.html

6. A crane accounts for 22.384 pounds of CO2 per gallon of diesel; 12-gallons burned = 12 X 22.384 = 268.6 pounds CO2 by crane per project

7. Referring to: tonto.eia.doe.gov/ftproot/environment/e-supdoc.pdf from the D.O.E., the US average is 1.638 pounds of CO2 emitted per 1-kwh of electricity generated  

8. In California, electricity generation accounts for 0.305 pounds of CO2 per one kilowatt-hour.

9. Telecom Lifters™ runs for 5 minutes per project = 0.083 hour; 0.305 X 0.083 = 0.025 pounds of CO2 per project.

10. Compare: Crane = 268.6 pounds, Telecom Lifters™ = 0.025 pounds; 268.6 divided by 0.025 = 10,744 times more CO2 emissions attributed to a crane than to Telecom Lifters™

11. Using a crane to modify just 1000 cellular tower sites in the San Francisco Bay Area accounts for 10.7 million times more carbon emissions than using the Telecom Lifters™ system to do the same work!

 

 Web Hosting by Yahoo!

Patent Pending on all versions of Telecom Lifters™.

 

 

 

 

 

 

Telecom Lifters™
P.O. Box 187
16912 Cache Lane
Brownsville, CA 95919
United States

ph: Toll Free1-800-576-7260 or 530-675-2228
fax: 530-675-9575
alt: 530-743-0200